Circle Square, Manchester
A studio unit on the hook at Circle Square, the development beside Manchester University. City-centre work with a live building behind the lift and a footpath in front of it.
Studio units craned onto a frontage at Circle Square in Manchester, a butterfly sculpture run from Salford to Leigh, fuel tanks taken out with two vehicles on one lift, and the Christmas markets going into Albert Square.
17 documented jobs from 2017, each with the photograph it came from. Every job is one we actually did.
Each one is a job that happened, captioned with what it was.
A studio unit on the hook at Circle Square, the development beside Manchester University. City-centre work with a live building behind the lift and a footpath in front of it.
The same job: a glazed modular unit swung up alongside the office frontage, the crew and ladders below it.
The unit brought round over containers already in position, with the boom out to most of its length.
23 March 2017. A tall openwork sculpture made of steel butterflies, strapped upright on the deck outside the workshop that built it, ready for the run from Salford to Leigh.
The same sculpture on the deck with the strops in and the vehicle about to move off. Artwork travels slowly and gets more packing than weight ever justifies.
Two of ours in Albert Square, building the Manchester Christmas markets in front of the Town Hall. The whole build runs to a road closure and a fixed number of hours.
A timber market chalet coming off the bed with the boom over the square. Dozens of them go in over a few days and every one lands within a marked footprint.
A dual lift: two of our cranes taking one fuel tank between them, with three of the crew on the ground managing it.
The same lift with the tank clear of the ground and both booms carrying it. Two vehicles on one load is a planned operation with a lift plan behind it.
A weathered green tank strapped down on the rigid, being taken off a site rather than onto one. A good deal of this work is removal.
July 2017. Working inside the building at a renewable energy plant at Dukinfield, feeding lengths of insulated ductwork in over the plant deck with the boom under the roof steels.
Large stainless ductwork lifted above head height inside a working building, with a banksman below it.
A stainless vessel taken inside the building on the trailer, the crane working under the roof steels.
September 2017. Three linked process tanks on the trailer at a working plant, with one of the crew up on the ladder getting the strops on.
Process tanks on the bed at a working plant, one of the crew up alongside them, cars parked right up to the vehicle.
An open-sided cabin and a second unit loaded nose to tail, waiting to leave a hard-standing for Hartlepool. At sixteen foot ten on the deck the route matters more than the lift, and every bridge on it is checked first.
The tractor unit and drag loaded with a long tank, working across an unmade site in the wet.