Portfolio

2018 — jobs we can show you

Steelwork into a new car park at Manchester Airport, the Manchester City matchday store craned into the city centre, RNLI lifeguard stations set out on the coast, and a welfare compound at Caernarfon begun in the week before Christmas.

18 documented jobs from 2018, each with the photograph it came from. Every job is one we actually did.

The record

What 2018 looked like

Each one is a job that happened, captioned with what it was.

A Nortons hiab lifting a long galvanised steel beam on slings at Manchester Airport

Steelwork at Manchester Airport

July 2018. A galvanised beam on the slings inside the airport boundary, going onto the frame of a new multi-storey. Airside and landside work is booked to a window and the window is the whole job.

A Nortons crane placing a galvanised steel beam onto a car park frame at Manchester Airport

A beam onto the frame

The same job from the other end, with the beam coming in over the columns and a banksman on the deck. Long steel is all about what the load does when it stops moving.

A light blue Manchester City matchday store unit lowered into position in a Manchester street

The matchday store, Manchester

The Manchester City official matchday store lowered onto its position behind barriers in the city centre, with a banksman on the corner watching the load in.

A retail unit loaded on a Nortons flatbed with the crane folded, against a clear sky

Loaded and out on a bright morning

The same unit on the flat bed against a clear sky, the crane folded and the vehicle ready to move off.

A Nortons crane lifting a unit between a modern glass frontage and Victorian stone buildings

Lifting between the old and the new

The unit going up between a glass frontage and Victorian stone, with the boom working over the street and the road closed to do it.

A Nortons hiab set up on its stabiliser legs in a wet street closed off with hazard tape

The street closed for the lift

Hazard tape across a wet street, bollards down and the vehicle set up on its legs before anything is lifted.

A long site cabin taken in under a building canopy by a Nortons crane with the crew steadying it

In under a canopy

A long unit taken in under a building canopy, ladders up and three of the crew steadying it, with only inches over the top.

A Nortons eight wheel rigid hiab on the concourse at the Etihad Stadium in Manchester

At the Etihad Stadium

The eight-wheel rigid empty on the concourse at the Etihad, crane stowed, at the end of the job.

A Nortons crane lifting a red container at Anfield with the stand behind

A container lifted at Anfield

A red container craned in at Anfield, the stand behind it, with the driver / operator working the crane from the deck.

A Nortons crane lifting an RNLI lifeguard station on strops beside the coast

An RNLI lifeguard station on the strops

A lifeguard station slung on four strops and swung off the deck onto the front. Light, tall and all glass on one side, so it is walked in on the line rather than swung.

A Nortons crane lifting a small lifeguard kiosk from the lorry bed onto open ground beside a road

The station set down on open ground

The same run of stations, one of them swung off the bed onto open ground beside a coast road, with a banksman well back on the tape line.

A Nortons hiab with the boom extended placing a long modular unit at a hospital site

Middlesbrough hospital

October 2018. A long modular unit landed on a prepared base at a hospital site, with the boom out to most of its length to reach past the hoarding line.

A Nortons hiab lorry set up on a university service road in Manchester

Manchester University

October 2018. Working on a university service road with the barriers out. Campus deliveries are usually about the route in, not the lift.

A forty by twelve foot modular site office set down inside a fenced yard at Bolton

A 40 x 12 office, Bolton

A forty by twelve foot office with a kitchen and a toilet in it, supplied to a Bolton scaffolding firm and set down inside their yard behind the palisade.

A Nortons hiab setting out the first green and white welfare cabins at Caernarfon

The first cabins at Caernarfon

December 2018. The start of the Caernarfon welfare compound, with the first units set out along the hard standing at dusk and more still to come.

Two Nortons lorry cranes lifting one load between them outside a goods warehouse

Two cranes, one load

Two of ours either side of a load at a goods warehouse, taking it between them. A planned dual lift, not two drivers helping each other out.

Two white portable cabins loaded on a Nortons rigid and drawbar trailer

Two cabins, one journey

A pair of white cabins on the rigid and the drag, loaded square and sheeted down for the road.

A blue welfare unit being loaded onto a Nortons trailer inside a warehouse

Loading inside the building

A blue welfare unit loaded onto the trailer inside a warehouse, working under a roof with the boom kept low.

The rest of the record

Every year we have photographs for

Later work, 2019  ·   Earlier work, 2017  ·   The whole portfolio

Tell us what needs lifting

Tell us what you need lifting or transporting and we will come back with a vehicle and a price.

ALLMI trained driver / operators · RAMS, method statements and lift plans · Euro VI clean air zone compliant fleet, renewed by continual investment in new wagons · All our accreditations