The year the 858 arrived and immediately got put to work. Frames for Hinkley Point lifted by two vehicles at once, precast concrete planks laid in, a brewing tank over a wall and into a working brewery, steel beams inside HMG Paints, the Town Hall gates away for refurbishment, painted bollards for the council in Stevenson Square, a collection from Arsenal's training ground, and a great deal of site accommodation.

31 documented jobs from 2024, each with the photograph it came from. Every job is one we actually did.

The record

What 2024 looked like

Each one is a job that happened, captioned with what it was.

Nortons 858 rigid and 658 artic loaded with steel frames bound for Hinkley Point

Frames for Hinkley Point

Steel frames loaded on the new 858 rigid and the 658 artic, bound for installation at Hinkley Point.

Two Nortons hiab cranes performing a dual lift on a single steel frame

A dual lift, two cranes on one load

Both vehicles taking the weight together so the frame stays level through the lift. A dual lift needs a written plan, an appointed person and one voice on the radio.

A Nortons rigid hiab set up on a narrow terraced street for a brewery lift

Setting up on the street for a brewery lift

The rigid set up on a terraced street outside the building, ready to take a brewing tank in. Where the vehicle can legally stand is half the job on a street this width.

Nortons 658 wagon and drag hiab lifting a portable cabin off the trailer

Cabins off the wagon and drag

The 658 wagon and drag lifting cabins off at a site set-up, with the drag trailer still loaded behind.

Nortons 658 hiab lifting a second portable cabin at a site set-up

A second unit on the hook

The same job later in the day. Site accommodation is the load we move more of than any other.

A fully refurbished portable cabin loaded on a Nortons trailer at the yard

A refurbished cabin ready to leave

A fully refurbished unit loaded and strapped at the yard, ready for delivery to a housing project.

A refurbished portable cabin delivered by Nortons and set down on site

The same unit delivered

Set down on site. The refurbishment side of the business and the haulage side often do the two halves of the same job.

Two portable cabins delivered and double stacked by a Nortons hiab

A double-stacked delivery

Two units delivered and stacked, which turns one site cabin into an office over a store.

Nortons hiab positioning a green container for a community bike library

A container for a community bike library

A container delivered and positioned for a community bike library. Not every job is a construction site.

A Nortons artic and trailer loaded outside the timber-clad frontage of Arsenal's training ground

A collection from Arsenal's training ground

August 2024, the artic and trailer loaded up outside Arsenal's training ground. Sports facilities run on temporary buildings and fencing in exactly the way construction sites do, and somebody has to take them away afterwards. A collection that far south is planned as a two-day job rather than a day out and back.

A Nortons Scania eight-wheel rigid parked outside Arsenal's training ground

The rigid on the same visit

The eight-wheeler on the same collection at Arsenal's training ground. Sports facilities are all timing - there is a window when the access road is free, and that is the window you get. Two vehicles on a collection is usually about the number of trips rather than the weight of any one load.

Ornate iron gates from Manchester Town Hall loaded on a Nortons wagon and drag

Manchester Town Hall gates

April 2024. The ornate iron gates from Manchester Town Hall on the wagon and drag, going away to be refurbished. Old ironwork is heavier than it looks and gets packed like glass.

A Nortons rigid hiab lifting a commercial truck wash gantry into position at Lymm

A truck wash at Lymm

January 2024. The gantry of a commercial truck wash lifted off the deck and lowered onto the rough at Lymm. Wide, light, and mostly brushwork and pipework, so it is packed before it is lifted.

A Nortons wagon and drag loaded with painted concrete bollards in Stevenson Square Manchester

Painted bollards for Manchester Council

The wagon and drag in Stevenson Square with a run of painted concrete bollards on the deck, working for Manchester City Council. City-centre work with a live junction on two sides of the vehicle.

A Nortons crane lifting a painted concrete bollard on chains in a Manchester street

One on the chains

A bollard on four chains and clear of the deck, going down onto its mark. They weigh what a small car weighs and they land within an inch.

A Nortons hiab delivering a refurbished cabin set up at Romiley Board Mill

A refurbished set-up to Romiley

A refurbished cabin set-up delivered to Romiley Board Mill and lifted off in the yard. Refurbished units go out looking new; the price is what makes people ask.

Refurbished portable cabins loaded on Nortons hiab lorries ready for delivery

Refurbished cabins loaded and ready

Cabins refurbished by our cabins division, loaded and ready for delivery by our own transport. One company sells the unit and the same company delivers it.

Two Nortons hiab lorries loaded with refurbished cabins in the yard

Two loads out of the same yard

Two vehicles loaded at the yard on the same morning. Most days look like this rather than like the photographs with the boom in the air.

A Nortons 858 hiab lifting a precast concrete plank on slings

Precast concrete on the slings

The new 858 lifting precast concrete planks in February 2024. Precast is heavy, brittle and unforgiving - it goes on the slings level or it does not go at all.

Site operatives guiding a precast concrete plank into position over reinforcement

Guided into the rebar

A plank being walked into position over the reinforcement. The crane does the weight; two people on the ground do the accuracy.

A precast concrete plank landed onto its bearing on site

Down onto the bearing

The plank landed. There is no adjusting it once it is down, so the setting out is finished before the lift starts.

A Nortons rigid 658 hiab lifting a brewing tank over a brick wall

A brewing tank over the wall

January 2024, the rigid 658 lifting a brewing tank over a brick wall and into position at a working brewery. There is no door big enough, so it goes in from above.

A Nortons 855 hiab working inside a building with steel beams on the floor

Steel beams inside the paint works

The 855 working inside the building at HMG Paints with the beams laid out on the floor. Working indoors takes the sky away and puts a roof at the top of every swing.

A Nortons 855 hiab in the doorway of a paint works during a steel beam lift

Down the length of the shop

The same job from the doorway. The beams run the length of the building and there is one way in and one way out.

Manchester Town Hall ironwork gates loaded on a Nortons wagon and drag

The Town Hall gates on the drag

Manchester Town Hall's ironwork gates loaded on the drag and away for refurbishment. Irreplaceable is a different problem from heavy.

A brightly painted concrete bollard being set down in a Manchester city centre street

A painted bollard set down

One of Manchester Council's painted bollards going down in the city centre. A small load in a pedestrianised street is a traffic management job first and a lifting job second.

A fully refurbished portable cabin loaded on a Nortons hiab ready for delivery

A cabin set ready for a housing project

A fully refurbished cabin set up, loaded and ready to leave for a new housing project.

A green container placed on site for a community bike library

The community bike library container

The container placed for a community bike library - secure parking and storage for the library bikes, with a bike kitchen inside.

A stainless steel process vessel lifted from a Nortons flatbed

A stainless vessel on the hook

A stainless process vessel coming off the bed. Polished stainless marks if you look at it wrong, so it is strops and softeners rather than chains.

A waste compactor loaded on the bed of a Nortons hiab lorry

A compactor loaded out

A waste compactor down on the bed and ready to travel. Plant with no lifting points designed into it is the ordinary case, not the exception.

A kiosk building being lowered onto a concrete slab by a Nortons hiab

A kiosk onto its slab

A kiosk building going down onto its slab. The slab is poured to the drawing; the kiosk has to land on it first time.

The Hinkley Point job is the one to look at. Two of our cranes lifting one load together is a planned operation with a lift plan behind it, not two drivers deciding to help each other out.

The rest of the record

Every year we have photographs for

Later work, 2025  ·   Earlier work, 2023  ·   The whole portfolio

Tell us what needs lifting

Tell us what you need lifting or transporting and we will come back with a vehicle and a price.

ALLMI trained driver / operators · RAMS, method statements and lift plans · Euro VI clean air zone compliant fleet, renewed by continual investment in new wagons · All our accreditations